Project Overview

British Builders attended a residential property on York Terrace in Cambridge to complete fire door remedial and compliance upgrade works to an existing FD30 timber entrance door set.

The door was inspected as a full assembly, including hinges, closer, gaps, seals, latching action and alignment. The existing hinges were removed and replaced with a new fire-rated Grade 11 hinge set suitable for fire door installations.

The door was realigned within the frame, with side and top gaps reduced to approximately 3mm and the bottom gap adjusted to approximately 5mm. The overhead closer was then recalibrated and tested to confirm smooth, secure and consistent self-closing operation.

 

Scope of Work
  • Site attendance for fire door remedial works
  • Inspection of existing FD30 timber entrance door set
  • Assessment of door leaf, frame, hinges, closer, seals and ironmongery
  • Removal of existing unsuitable hinge set
  • Supply and installation of new fire-rated Grade 11 hinges
  • Adjustment of perimeter gaps to improve compliance tolerances
  • Reduction of side and top gaps to approximately 3mm
  • Adjustment of bottom door gap to approximately 5mm
  • Readjustment and recalibration of overhead door closer
  • Testing of closing speed, latching action and full engagement
  • Inspection of intumescent strips and cold smoke seals
  • Final operational testing after adjustments

 

Challenges & Solutions
  • Fire door compliance — The full door assembly was reviewed, including hinges, closer, gaps, seals and latching action.
  • Unsuitable hinges — The existing hinges were replaced with a new fire-rated Grade 11 hinge set.
  • Uneven gaps — The door was realigned to improve side, top and bottom gap tolerances.
  • Self-closing reliability — The overhead closer was recalibrated and tested for smooth, secure closing.

 

Final Outcome

The fire door remedial and compliance upgrade works were completed successfully.

The existing FD30 timber entrance door set was retained, with improvements made to the hinges, alignment, gap tolerances and self-closing operation.

Final checks confirmed that the door aligned correctly, closed smoothly and latched properly, improving its function as part of the building’s fire safety protection system.

 

Client Feedback

“British Builders completed the fire door remedial works carefully and efficiently. The hinges were upgraded, the gaps were corrected and the door now closes properly as required.” – Property Client

Leave a comment

Your email address will not be published. Required fields are marked *

©2025 Copyrights 24 British Builders | All rights Reserved | Company Number: 10615360 | Website managed by 24 British Builders

Acredited by