Internal Remedial Works — Manchester

Internal remedial works in Manchester apartment

Internal Remedial Works

  • Location
    The Green Building, New Wakefield, Manchester
Bathroom cleaning mould treatment and remedial repairs at The Green Building Manchester

Internal Remedial Works — The Green Building, New Wakefield, Manchester

Project Overview

British Builders attended a flat at The Green Building, New Wakefield in Manchester to complete internal remedial works, safety checks, cleaning and minor repairs across the property.

The works covered the hallway, kitchen, living room, bedroom and bathroom, bringing multiple smaller issues into one coordinated visit. In the bathroom, mould-affected ceiling areas were treated, the extractor fan was cleaned, and defective sealant and grout were removed and renewed where required.

In the kitchen, old sealant was removed and replaced with sanitary-grade silicone, while the existing oven was removed for disposal after safe isolation. Additional works included local decoration touch-ups, minor making good, securing curtain poles, checking the hallway smoke alarm and completing a final clean-down.

 

Scope of Work
  • Site attendance and inspection of internal areas across the flat
  • Assessment of hallway, kitchen, living room, bedroom and bathroom condition
  • Protection of working areas before remedial works began
  • Localised decoration touch-ups and minor making good
  • Removal and renewal of defective kitchen sealant
  • Removal and disposal of existing oven, subject to prior isolation
  • Bathroom mould treatment using anti-fungal solution
  • Cleaning of bathroom ceiling areas, extractor fan and surrounding vent
  • Replacement of defective bathroom sealant and grout where required
  • Securing and minor repair of curtain poles
  • Inspection of hallway smoke alarm with allowance for replacement if required
  • Waste removal and final clean-down on completion

 

Challenges & Solutions
  • Multiple small issues — The works were grouped into one organised visit across several rooms.
  • Bathroom mould — Affected ceiling areas were treated and the extractor fan was cleaned to improve hygiene and airflow.
  • Defective sealant and grout — Failed junctions were removed, prepared and resealed for a cleaner finish.
  • Kitchen preparation — Old sealant was renewed with sanitary-grade silicone.
  • Safety checks — The existing smoke alarm was inspected, with allowance for replacement where required.
  • Lettable condition — Cleaning, minor repairs and making good improved the flat without full refurbishment.

 

Final Outcome

The internal remedial works were completed successfully.

The bathroom was cleaned, treated and resealed, the extractor fan was cleaned, kitchen sealant was renewed, the oven was removed, curtain poles were secured, and localised defects were made good where required.

The completed works helped bring the flat back to a cleaner, safer and more presentable condition, ready for normal use and future occupation.

 

Client Feedback

“British Builders handled the remedial works professionally. The bathroom, kitchen and internal areas were cleaned, repaired and left in a much better condition.” – Property Client